ALLAH NAMES

Sunday, April 17, 2011

Channel Tunnel

Channel Tunnel
Map of the Channel Tunnel
Overview
Location English Channel (Strait of Dover)
Coordinates Folkestone: 51°5′49.5″N 1°9′21″E
Coquelles: 50°55′22″N 1°46′50.16″E
Status Active
Start Folkestone, Kent, United Kingdom
End Coquelles, Pas-de-Calais, France
Operation
Opened 6 May 1994 (tunnel)
14 November 1994 (passenger service)
Owner Eurotunnel
Operator Eurotunnel
Eurostar
DB Schenker Rail (UK)
SNCF
Character Through-rail passenger and freight. Vehicle shuttle.
Technical
Line length 50.45 km (31.35 mi)
No. of tracks 2 single track tunnels
1 service tunnel
Gauge 1,435 mm (4 ft 8 12 in) (standard gauge)
Electrified 25 kV AC OHLE
The Channel Tunnel (French: Le tunnel sous la Manche), (also referred to as the Chunnel)[1][2] is a 50.5-kilometre (31.4 mi) undersea rail tunnel linking Folkestone, Kent in the United Kingdom with Coquelles, Pas-de-Calais near Calais in northern France beneath the English Channel at the Strait of Dover. At its lowest point, it is 75 metres (250 ft) deep.[3][4][5] At 37.9 kilometres (23.5 mi), the Channel Tunnel possesses the longest undersea portion of any tunnel in the world, although the Seikan Tunnel in Japan is both longer overall at 53.85 kilometres (33.46 mi), and deeper at 240 metres (790 ft) below sea level.
The tunnel carries high-speed Eurostar passenger trains, Eurotunnel Shuttle roll-on/roll-off vehicle transport—the largest in the world—and international rail freight trains.[6] The tunnel connects end-to-end with the LGV Nord and High Speed 1 high-speed railway lines. In 1996 the American Society of Civil Engineers identified the tunnel as one of the Seven Wonders of the Modern World.[7]
Ideas for a cross-Channel fixed link appeared as early as 1802,[8][9] but British political and press pressure over compromised national security stalled attempts to construct a tunnel.[10] However, the eventual successful project, organised by Eurotunnel, began construction in 1988 and opened in 1994. The project came in 80% over its predicted budget.[11] Since its construction, the tunnel has faced several problems. Fires have disrupted operation of the tunnel. Illegal immigrants and asylum seekers have attempted to use the tunnel to enter Britain,[12] causing a minor diplomatic disagreement over the siting of the Sangatte refugee camp, which was eventually closed in 2002.[13]

Contents

  • 1 Origins
    • 1.1 Proposals and attempts
    • 1.2 Arrangement
    • 1.3 Construction
    • 1.4 Completion
  • 2 Engineering
    • 2.1 Geology
    • 2.2 Surveying
    • 2.3 Tunnelling
    • 2.4 Railway design
      • 2.4.1 Communications
      • 2.4.2 Power supply
      • 2.4.3 Signalling
      • 2.4.4 Track system
    • 2.5 Rolling stock
      • 2.5.1 Eurotunnel Shuttle
      • 2.5.2 Freight locomotives
      • 2.5.3 International passenger
      • 2.5.4 Service locomotives
  • 3 Operation
    • 3.1 Usage and services
      • 3.1.1 Passenger traffic volumes
      • 3.1.2 Freight traffic volumes
      • 3.1.3 Economic performance
  • 4 Terminals
  • 5 Regional impact
  • 6 Incidents
    • 6.1 Fires
    • 6.2 Train failures
    • 6.3 Asylum and immigration
    • 6.4 Safety

Origins

Proposals and attempts

Key dates
1802 Albert Mathieu put forward a cross-Channel tunnel proposal.
1875 The Channel Tunnel Company Ltd[14] began preliminary trials
1882 The Abbot's Cliff heading had reached 897 yards (820 m) and that at Shakespeare Cliff was 2,040 yards (1,870 m) in length
January 1975 A UK–France government backed scheme that started in 1974 was cancelled
February 1986 The Treaty of Canterbury was signed allowing the project to proceed
June 1988 First tunnelling commenced in France
December 1988 UK TBM commenced operation
December 1990 The service tunnel broke through under the Channel
May 1994 The tunnel was formally opened by HM The Queen and President Mitterrand
Mid 1994 Freight and passenger trains commenced operation
November 1996 A fire in a lorry shuttle severely damaged the tunnel
November 2007 High Speed 1, linking London to the tunnel, opened
September 2008 Another fire in a lorry shuttle severely damaged the tunnel
December 2009 Eurostar trains stranded in the tunnel due to melting snow affecting the trains' electrical hardware
In 1802, French mining engineer Albert Mathieu put forward a proposal to tunnel under the English Channel, with illumination from oil lamps, horse-drawn coaches, and an artificial island mid-Channel for changing horses.[8]
In the 1830s, Frenchman Aimé Thomé de Gamond performed the first geological and hydrographical surveys on the Channel, between Calais and Dover. Thomé de Gamond explored several schemes and, in 1856, he presented a proposal to Napoleon III for a mined railway tunnel from Cap Gris-Nez to Eastwater Point with a port/airshaft on the Varne sandbank[15] at a cost of 170 million francs, or less than £7 million.[16]
Thomé de Gamond's 1856 plan for a cross-Channel link, with a port/airshaft on the Varne sandbank mid-Channel
In 1865, a deputation led by George Ward Hunt proposed the idea of a tunnel to the Chancellor of the Exchequer of the day, William Ewart Gladstone.[17]
After 1867, William Low and Sir John Clarke Hawkshaw promoted ideas, but none were implemented. An official Anglo-French protocol was established in 1876 for a cross-Channel railway tunnel. In 1881, British railway entrepreneur Sir William Watkin and French Suez Canal contractor Alexandre Lavalley were in the Anglo-French Submarine Railway Company that conducted exploratory work on both sides of the Channel. On the English side a 2.13-metre (7 ft) diameter Beaumont-English boring machine dug a 1,893-metre (6,211 ft) pilot tunnel from Shakespeare Cliff. On the French side, a similar machine dug 1,669 m (5,476 ft) from Sangatte. The project was abandoned in May 1882, owing to British political and press campaigns advocating that a tunnel would compromise Britain's national defences.[10] These early works were encountered more than a century later during the TML project.
In 1919, during the Paris Peace Conference, British Prime Minister David Lloyd George repeatedly brought up the idea of a Channel tunnel as a way of reassuring France about British willingness to defend against another German attack. The French did not take the idea seriously and nothing came of Lloyd George's proposal.[18]
In 1955, defence arguments were accepted to be irrelevant because of the dominance of air power; thus, both the British and French governments supported technical and geological surveys. Construction work commenced on both sides of the Channel in 1974, a government-funded project using twin tunnels on either side of a service tunnel, with capability for car shuttle wagons. In January 1975, to the dismay of the French partners, the British government cancelled the project. The government had changed to the Labour Party and there was uncertainty about EEC membership, cost estimates had ballooned to 200% and the national economy was troubled. By this time the British Priestly tunnel boring machine was ready and the Ministry of Transport was able to do a 300 m (980 ft) experimental drive.[10] This short tunnel would however be reused as the starting and access point for tunnelling operations from the British side.
In 1979, the "Mouse-hole Project" was suggested when the Conservatives came to power in Britain. The concept was a single-track rail tunnel with a service tunnel, but without shuttle terminals. The British government took no interest in funding the project, but Prime Minister Margaret Thatcher said she had no objection to a privately funded project. In 1981 British and French leaders Margaret Thatcher and François Mitterrand agreed to set up a working group to look into a privately funded project, and in April 1985 promoters were formally invited to submit scheme proposals. Four submissions were shortlisted:
  • a rail proposal based on the 1975 scheme presented by Channel Tunnel Group/France–Manche (CTG/F–M),
  • Eurobridge: a 4.5 km (2.8 mi) span suspension bridge with a roadway in an enclosed tube
  • Euroroute: a 21 km (13 mi) tunnel between artificial islands approached by bridges, and
  • Channel Expressway: large diameter road tunnels with mid-channel ventilation towers.[10]
The cross-Channel ferry industry protested under the name "Flexilink". In 1975 there was no campaign protesting against a fixed link, with one of the largest ferry operators (Sealink) being state-owned. Flexilink continued rousing opposition throughout 1986 and 1987.[10] Public opinion strongly favoured a drive-through tunnel, but ventilation issues, concerns about accident management, and fear of driver mesmerisation led to the only shortlisted rail submission, CTG/F-M, being awarded the project.[10]

Arrangement

A block diagram describing the organisation structure used on the project. Eurotunnel is the central organisation for construction and operation (via a concession) of the tunnel
The British Channel Tunnel Group consisted of two banks and five construction companies, while their French counterparts, France–Manche, consisted of three banks and five construction companies. The role of the banks was to advise on financing and secure loan commitments. On 2 July 1985, the groups formed Channel Tunnel Group/France–Manche (CTG/F–M). Their submission to the British and French governments was drawn from the 1975 project, including 11 volumes and a substantial environmental impact statement.[10]
The design and construction was done by the ten construction companies in the CTG/F-M group. The French terminal and boring from Sangatte was undertaken by the five French construction companies in the joint venture group GIE Transmanche Construction. The English Terminal and boring from Shakespeare Cliff was undertaken by the five British construction companies in the Trankslink Joint Venture. The two partnerships were linked by TransManche Link (TML), a bi-national project organisation.[10] The Maître d'Oeuvre was a supervisory engineering body employed by Eurotunnel under the terms of the concession that monitored project activity and reported back to the governments and banks.[19]
In France, with its long tradition of infrastructure investment, the project garnered widespread approval and in April the French National Assembly gave unanimous support and, in June 1987, after a public inquiry, the Senate gave unanimous support. In Britain, select committees examined the proposal, making history by holding hearings outside of Westminster, in Kent. In February 1987, the third reading of the Channel Tunnel Bill took place in the House of Commons, and was carried by 94 votes to 22. The Channel Tunnel Act gained Royal assent and passed into English law in July of that year.[10] Parliamentary support for the project came partly from provincial members of Parliament on the basis of promises of regional Eurostar through train services that have never materialised; the promises were repeated in 1996 when the contract for construction of the Channel Tunnel Rail Link was awarded.[20]
The Channel Tunnel is a build-own-operate-transfer (BOOT) project with a concession.[21] TML would design and build the tunnel, but financing was through a separate legal entity: Eurotunnel. Eurotunnel absorbed CTG/F-M and signed a construction contract with TML; however, the British and French governments controlled final engineering and safety decisions, which are now in the hands of the Channel Tunnel Safety Authority. The British and French governments gave Eurotunnel a 55- (later 65-) year operating concession to repay loans and pay dividends. A Railway Usage Agreement was signed between Eurotunnel, British Rail and the Société Nationale des Chemins de fer Français guaranteeing future revenue in exchange for the railways obtaining half of the tunnel's capacity.
Private funding for such a complex infrastructure project was of unprecedented scale. An initial equity of £45 million was raised by CTG/F-M, increased by £206 million private institutional placement, £770 million was raised in a public share offer that included press and television advertisements, a syndicated bank loan and letter of credit arranged £5 billion.[10] Privately financed, the total investment costs at 1985 prices were £2600 million. At the 1994 completion actual costs were, in 1985 prices, £4650 million: an 80% cost overrun.[11] The cost overrun was partly due to enhanced safety, security, and environmental demands.[21] Financing costs were 140% higher than forecast.[22]

Construction

Eleven tunnel boring machines, working from both sides (United Kingdom to France) of the Channel, cut through chalk marl to construct two rail tunnels and a service tunnel. The vehicle shuttle terminals are at Cheriton (part of Folkestone) and Coquelles, and are connected to the British and French motorways (M20 and A16 respectively).
Tunnelling commenced in 1988, and the tunnel began operating in 1994.[23] In 1985 prices, the total construction cost was £4.650 billion (equivalent to £11 billion today), an 80% cost overrun. At the peak of construction 15,000 people were employed with daily expenditure over £3 million.[24] Ten workers, eight of them British, were killed during construction between 1987 and 1993, most in the first few months of boring.[25][26][27]

Completion

The Channel Tunnel was opened in Calais on 6 May 1994 by British Queen Elizabeth II and French President François Mitterrand
A small, two-inch (50-mm) diameter pilot hole allowed the service tunnel to break through without ceremony on 30 October 1990.[28] On 1 December 1990, Englishman Graham Fagg and Frenchman Phillippe Cozette broke through the service tunnel with the media watching.[29] Eurotunnel completed the tunnel boring on time,[21] and the tunnel was officially opened one year later than originally planned by British Queen Elizabeth II and French President François Mitterrand in a ceremony held in Calais on 6 May 1994. The Queen travelled through the tunnel to Calais on a Eurostar train, which stopped nose to nose with the train that carried President Mitterrand from Paris.[30] Following the ceremony President Mitterrand and the Queen travelled on Le Shuttle to a similar ceremony in Folkestone.[30] A full public service did not start for several months.
The Channel Tunnel Rail Link (CTRL), now called High Speed 1, runs 69 miles (111 km) from St Pancras railway station in London to the Channel Tunnel portal at Folkestone in Kent. It cost £5.8 billion. On 16 September 2003 UK Prime Minister Tony Blair opened the first section of High Speed 1, from Folkestone to north Kent. On 6 November 2007 the Queen officially opened High Speed 1 and St Pancras International station,[31] replacing the original slower link to Waterloo International railway station. On High Speed 1 trains travelling at speeds up to 300 km/h (186 mph), the journey from London to Paris takes 2 hours 15 minutes and London to Brussels takes 1 hour 51 minutes.[32]
In 1996, the American Society of Civil Engineers, with Popular Mechanics, selected the tunnel as one of the Seven Wonders of the Modern World.[7]

Engineering

The Channel Tunnel exhibit at the National Railway Museum in York, England, showing the circular cross section of the tunnel with the overhead line powering a Eurostar train. Also visible is the segmented tunnel lining
Surveying undertaken in the twenty years before tunnel construction confirmed earlier speculations that a tunnel route could be bored through a chalk marl stratum. The chalk marl was conducive to tunnelling, with impermeability, ease of excavation and strength. While on the English side the chalk marl ran along the entire length of the tunnel, on the French side a length of 5 kilometres (3 mi) had variable and difficult geology. The Channel Tunnel consists of three bores: two 7.6-metre (25 ft) diameter rail tunnels, 30 metres (98 ft) apart, 50 kilometres (31 mi) in length with a 4.8-metre (16 ft) diameter service tunnel in between. There are also cross-passages and piston relief ducts. The service tunnel was used as a pilot tunnel, boring ahead of the main tunnels to determine the conditions. English access was provided at Shakespeare Cliff, while French access came from a shaft at Sangatte. The French side used five tunnel boring machines (TBMs), the English side used six. The service tunnel uses Service Tunnel Transport System (STTS) and Light Service Tunnel Vehicles (LADOGS). Fire safety was a critical design issue.
Between the portals at Beussingue and Castle Hill the tunnel is 50.5 kilometres (31 mi) long, with 3.3 kilometres (2 mi) under land on the French side, 9.3 kilometres (6 mi) under land on the UK side and 37.9 kilometres (24 mi) under sea.[4] This makes the Channel Tunnel the second longest rail tunnel in the world, behind the Seikan Tunnel in Japan, but with the longest under-sea section.[33] The average depth is 45 metres (148 ft) below the seabed.[34] On the UK side, of the expected 5 million cubic metres (6.5×106 cu yd) of spoil approximately 1 million cubic metres (1.3×106 cu yd) was used for fill at the terminal site, and the remainder was deposited at Lower Shakespeare Cliff behind a seawall, reclaiming 74 acres (30 ha)[24] of land.[35] This land was then made into the Samphire Hoe Country Park. Environmental impact assessment did not identify any major risks for the project, and further studies into safety, noise, and air pollution were overall positive. However, environmental objections were raised over a high-speed link to London.[36]

Geology

Geological profile along the tunnel as constructed. For the majority of its length the tunnel bores through a chalk marl stratum (layer)
Successful tunnelling under the channel required a sound understanding of the topography and geology and the selection of the best rock strata through which to tunnel. The geology generally consists of northeasterly dipping Cretaceous strata, part of the northern limb of the Wealden-Boulonnais dome. Characteristics include:
  • Continuous chalk on the cliffs on either side of the Channel containing no major faulting, as observed by Verstegan in 1698
  • Four geological strata, marine sediments laid down 90–100 million years ago; pervious upper and middle chalk above slightly pervious lower chalk and finally impermeable Gault Clay. A sandy stratum, glauconitic marl (tortia), is in between the chalk marl and gault clay
  • A 25–30-metre (82–98 ft) layer of chalk marl (French: craie bleue) in the lower third of the lower chalk appeared to present the best tunnelling medium. The chalk has a clay content of 30–40% providing impermeability to groundwater yet relatively easy excavation with strength allowing minimal support. Ideally the tunnel would be bored in the bottom 15 metres (49 ft) of the chalk marl, allowing water inflow from fractures and joints to be minimised, but above the gault clay that would increase stress on the tunnel lining and swell and soften when wet.[37]
On the English side of the channel, the strata dip less than 5°, however, on the French side, this increases to 20°. Jointing and faulting is present on both the English and French sides. On the English side, only minor faults of displacement less than 2 metres (7 ft) exist. On the French side, displacements of up to 15 metres (49 ft) are present owing to the Quenocs anticlinal fold. The faults are of limited width, filled with calcite, pyrite and remoulded clay. The increased dip and faulting restricted the selection of route on the French side. To avoid confusion, microfossil assemblages were used to classify the chalk marl. On the French side, particularly near the coast, the chalk was harder, and more brittle, and more fractured than on the English side. This led to the adoption of different tunnelling techniques on the French and English sides.[38]
The Quaternary undersea valley Fosse Dangaered, and Castle Hill landslip, located at the English portal, caused concerns. Identified by the 1964–65 geophysical survey, the Fosse Dangaered is an infilled valley system extending 80 metres (262 ft) below the seabed, 500 metres (1,640 ft) south of the tunnel route, located mid-channel. A 1986 survey showed that a tributary crossed the path of the tunnel, and so the tunnel route was made as far north and deep as possible. The English terminal had to be located in the Castle Hill landslip, which consists of displaced and tipping blocks of lower chalk, glauconitic marl and gault debris. Thus the area was stabilised by buttressing and inserting drainage adits.[38] The service tunnels were pilot tunnels preceding the main tunnels, so that the geology, areas of crushed rock, and zones of high water inflow could be predicted. Exploratory probing took place in the service tunnels, in the form of extensive forward probing, vertical downward probes and sideways probing.[38]

Surveying

Marine soundings and samplings by Thomé de Gamond were carried out during 1833–1867, establishing the seabed depth at a maximum of 55 metres (180 ft) and the continuity of geological strata (layers). Surveying continued over many years, with 166 marine and 70 land-deep boreholes being drilled and over 4,000-line-kilometres of marine geophysical survey completed.[39] Surveys were undertaken in 1958–1959, 1964–1965, 1972–1974 and 1986–1988.
The surveying in 1958–1959 catered for immersed tube and bridge designs as well as a bored tunnel, and thus a wide area was investigated. At this time marine geophysics surveying for engineering projects was in its infancy, with poor positioning and resolution from seismic profiling. The 1964–1965 surveys concentrated on a northerly route that left the English coast at Dover harbour; using 70 boreholes, an area of deeply weathered rock with high permeability was located just south of Dover harbour.[39]
Given the previous survey results and access constraints, a more southerly route was investigated in the 1972–1973 survey and the route was confirmed to be feasible. Information for the tunnelling project also came from work before the 1975 cancellation. On the French side at Sangatte a deep shaft with adits was made. On the English side at Shakespeare Cliff, the government allowed 250 metres (820 ft) of 4.5-metre (15 ft) diameter tunnel to be driven. The actual tunnel alignment, method of excavation and support were essentially the same as the 1975 attempt. In the 1986–1997 survey, previous findings were reinforced and the nature of the gault clay and the tunnelling medium (chalk marl that made up 85% of the route) were investigated. Geophysical techniques from the oil industry were employed.[39]

Tunnelling

Typical tunnel cross section, with a service tunnel between twin rail tunnels. Shown linking the rail tunnels is a piston relief duct, necessary to manage pressure changes due to the movement of trains
Tunnelling between England and France was a major engineering challenge, with the only precedent being the undersea Seikan Tunnel in Japan. A serious risk with underwater tunnels is major water inflow due to the water pressure from the sea above under weak ground conditions. The Channel Tunnel also had the challenge of time—being privately funded, early financial return was paramount.
The objective was to construct: two 7.6-metre (25 ft) diameter rail tunnels, 30 metres (98 ft) apart, 50 kilometres (31 mi) in length; a 4.8-metre (16 ft) diameter service tunnel between the two main tunnels; pairs of 3.3-metre (11 ft) diameter cross-passages linking the rail tunnels to the service tunnel at 375-metre (1,230 ft) spacing; piston relief ducts 2-metre (7 ft) diameter connecting the rail tunnels at 250-metre (820 ft) spacing; two undersea crossover caverns to connect the rail tunnels.[40] The service tunnel always preceded the main tunnels by at least 1 kilometre (0.6 mi) to ascertain the ground conditions. There was plenty of experience with tunnelling through chalk in the mining industry. The undersea crossover caverns were a complex engineering problem. The French cavern was based on the Mount Baker Ridge freeway tunnel in the USA. The UK cavern was dug from the service tunnel ahead of the main tunnels to avoid delay.
Precast segmental linings in the main TBM drives were used, but different solutions were used on the English and French sides. On the French side, neoprene and grout sealed bolted linings made of cast iron or high-strength reinforced concrete were used. On the English side, the main requirement was for speed and bolting of cast-iron lining segments was only carried out in areas of poor geology. In the UK rail tunnels, eight lining segments plus a key segment were used; on the French side, five segments plus a key segment.[41] On the French side, a 55-metre (180 ft) diameter 75-metre (246 ft) deep grout-curtained shaft at Sangatte was used for access. On the English side, a marshalling area was 140 metres (459 ft) below the top of Shakespeare Cliff, and the New Austrian Tunnelling method (NATM) was first applied in the chalk marl here. On the English side, the land tunnels were driven from Shakespeare Cliff, the same place as the marine tunnels, not from Folkestone. The platform at the base of the cliff was not large enough for all of the drives and, despite environmental objections, tunnel spoil was placed behind a reinforced concrete seawall, on condition of placing the chalk in an enclosed lagoon to avoid wide dispersal of chalk fines. Owing to limited space, the precast lining factory was on the Isle of Grain in the Thames estuary.[40]
On the French side, owing to the greater permeability to water, earth pressure balance TBMs with open and closed modes were used. The TBMs were of a closed nature during the initial 5 kilometres (3 mi), but then operated as open, boring through the chalk marl stratum.[40] This minimised the impact to the ground and allowed high water pressures to be withstood, and it also alleviated the need to grout ahead of the tunnel. The French effort required five TBMs: two main marine machines, one main land machine (the short land drives of 3 km allowed one TBM to complete the first drive then reverse direction and complete the other), and two service tunnel machines. On the English side, the simpler geology allowed faster open-faced TBMs.[42] Six machines were used, all commenced digging from Shakespeare Cliff, three marine-bound and three for the land tunnels.[40] Towards the completion of the undersea drives, the UK TBMs were driven steeply downwards and buried clear of the tunnel. The French TBMs then completed the tunnel and were dismantled.[43] A 900 mm gauge railway was used on the English side during construction.[44]
In contrast to the English machines, which were simply given alphanumeric names, the French tunnelling machines were all named after women: Brigitte, Europa, Catherine, Virginie, Pascaline, Séverine.[45]

Railway design

Interior of Eurotunnel Shuttle, a vehicle shuttle train. The largest railway wagons in the world,[24] the shuttle trains transport vehicles between terminals on either side of the tunnel

Communications

There are three communication systems in the tunnel: concession radio (CR) for mobile vehicles and personnel within Eurotunnel's Concession (terminals, tunnels, coastal shafts); track-to-train radio (TTR) for secure speech and data between trains and the railway control centre; Shuttle internal radio (SIR) for communication between shuttle crew and to passengers over car radios.[46]

Power supply

All tunnel services run on electricity, shared equally from English and French sources. Power is delivered to the locomotives via an overhead line (catenary)[47] at 25 kV 50 Hz.[48]
A large proportion of the railway south of London uses a 750 V DC third rail to deliver electrical power; however since the opening of High Speed 1 there is no need to use the third rail system for any part of the Eurostar journey. High Speed 1, the tunnel itself and the route to Paris has power provided via overhead catenary at 25 kV 50 Hz. The railways on "classic" lines in Belgium are also electrified by overhead catenaries, but at 3000 V DC.[48]

Signalling

A cab signalling system is used that gives information directly to train drivers on a display. There is Automatic Train Protection (ATP) that stops the train if the speed differs from that indicated on the in-cab display. TVM430, as used on LGV Nord, is used in the tunnel.[49] The maximum allowed speed is 160 km/h.[50]

Track system

The American Sonneville International Corporation track system consisting of UIC60 rails on 900A grade resting on microcellular EVA pads, bolted into concrete was chosen.[51] The larger European GB+ loading gauge was used rather than one of the smaller UK alternatives; this gauge is maintained on High Speed 1 as far as Barking in east London.[52] Ballasted track was ruled out owing to maintenance constraints and a need for geometric stability.

Rolling stock

Entrance to the Channel Tunnel near Coquelles (France)

Eurotunnel Shuttle

Initially 38 Le Shuttle locomotives were commissioned, working in pairs with one at each end of a shuttle train. The shuttles have two separate halves: single and double deck. Each half has two loading/unloading wagons and twelve carrier wagons. Eurotunnel's original order was for nine tourist shuttles.
HGV shuttles also have two halves, with each half containing one loading wagon, one unloading wagon and 14 carrier wagons. There is a club car behind the leading locomotive. Eurotunnel originally ordered six HGV shuttles rakes.

Freight locomotives

Forty-six Class 92 locomotives for hauling freight trains and overnight passenger trains (the Nightstar project, which was abandoned) were commissioned, which can run on both overhead AC and third-rail DC power.

International passenger

Thirty-one Eurostar trains—based on the French TGV—built to UK loading gauge, and with many modifications for safety within the tunnel, were commissioned, with split ownership between British Rail, French National Railway Company and National Railway Company of Belgium. British Rail ordered seven more for services north of London.[53]
At the end of 2009, extensive fire-proofing requirements were dropped and Deutsche Bahn received permission to run German Intercity-Express (ICE) trains through the Channel Tunnel in the future. On 19 October 2010 Deutsche Bahn ran the first ICE train through the Channel Tunnel arriving in St. Pancras after evacuation tests in the tunnel were a success.[54][55][not in citation given]

Service locomotives

Diesel locomotives for rescue and shunting work are Eurotunnel Class 0001 and Eurotunnel Class 0031.

Operation

Usage and services

A Channel Tunnel traffic graph showing the number of passengers and tonnes of freight. Freight vehicle shuttle numbers dropped in 1996/7 owing to closure of the service after the November 1996 fire
The British terminal at Cheriton in west Folkestone. The terminal services shuttle trains that carry vehicles, and is linked to the M20 motorway
The Folkestone White Horse is the last view of England for most passengers embarking at the Cheriton terminal
Services offered by the tunnel are:
  • Eurotunnel Shuttle (formerly Le Shuttle) roll-on roll-off shuttle service for road vehicles,
  • Eurostar passenger trains,
  • through freight trains.[6]
Both the freight and passenger traffic forecasts that led to the construction of the tunnel were largely and universally overestimated. Particularly, Eurotunnel's commissioned forecasts were over-predictions.[56] Although the captured share of Channel crossings (competing with air and sea) was forecast correctly, high competition and reduced tariffs has led to low revenue. Overall cross-Channel traffic was overestimated.[57]
However with the EU's liberalisation of international rail services, the tunnel and High Speed 1 have been open to competition since 2010. There have been a number of operators interested in running services including Deutsche Bahn, through the tunnel and along High Speed 1 to London.

Passenger traffic volumes

Total cross-tunnel passenger traffic volumes peaked at 18.4 million in 1998, then dropped to 14.9 million in 2003, from then rising again to 17.0 million in 2010.
At the time of the decision about building the tunnel, 15.9 million passengers were predicted for Eurostar trains in the opening year. In 1995, the first full year, actual numbers were a little over 2.9 million, growing to 7.1 million in 2000, then dropping again to 6.3 million in 2003. However, Eurostar was also limited by the lack of a high-speed connection on the British side. After the completion of High Speed 1 (formerly CTRL) to London in two stages in 2003 and 2007, traffic increased. In 2008, Eurostar carried 9,113,371 passengers in cross-Channel-Tunnel traffic, a 10% increase over the previous year, despite traffic limitations due to the 2008 Channel Tunnel fire.[58] Eurostar passenger numbers continued to increase, reaching 9,528,558 in 2010.[59]
 Year  Passengers transported...
by Eurostar[A][60][61]
(actual ticket sales)
by Eurotunnel Passenger Shuttles[57][60]
(estimated, millions)
Total
(estimated, millions)
1994 ~100,000[57] 0.2 0.3
1995 2,920,309 4.4 7.3
1996 4,995,010 7.9 12.9
1997 6,004,268 8.6 14.6
1998 6,307,849 12.1 18.4
1999 6,593,247 11.0 17.6
2000 7,130,417 9.9 17.0
2001 6,947,135 9.4 16.3
2002 6,602,817 8.6 15.2
2003 6,314,795 8.6 14.9
2004 7,276,675 7.8 15.1
2005 7,454,497 8.2 15.7
2006 7,858,337 7.8 15.7
2007 8,260,980 7.9 16.2
2008 9,113,371 7.0 16.1
2009 9,220,233 6.9 16.1
2010[62] 9,528,558 7.5 17.0
A only passengers taking Eurostar to cross the Channel

Freight traffic volumes

Cross-tunnel freight traffic volumes have been erratic, with a decrease during 1997 due to a closure caused by a fire in a freight shuttle. The total freight crossings increased over the period, indicating the substitutability of the tunnel by sea crossings. The tunnel has achieved a cross-Channel freight traffic market share close to or above Eurotunnel's 1980s predictions but Eurotunnel's 1990 and 1994 predictions were overestimates.
For freight transported on through freight trains, the first year freight prediction was 7.2 million gross tonnes, however, the actual 1995 figure was 1.3 million gross tonnes.[56] Through freight volumes peaked in 1998 at 3.1 million tonnes. However, with continuing problems, this figure fell back to 1.21 million tonnes in 2007, increasing again slightly to 1.24 million tonnes in 2008.[58] Together with that carried on freight shuttles, freight traffic growth has occurred since opening, with 6.4 million tonnes carried in 1995, 18.4 million tonnes recorded in 2003[57] and 19.6 million tonnes in 2007.[60] Numbers fell back in the wake of the 2008 fire.
 Year  Freight transported...
by through freight trains[61]
(actual tonnes)
by Eurotunnel Truck Shuttles[57][60]
(estimated, million tonnes)
Total
(estimated, million tonnes)
1994 0 0.8[57] 0.8
1995 1,349,802 5.1 6.4
1996 2,783,774 6.7 9.5
1997 2,925,171 3.3 6.2
1998 3,141,438 9.2 12.3
1999 2,865,251 10.9 13.8
2000 2,947,385 14.7 17.6
2001 2,447,432 15.6 18.0
2002 1,463,580 15.6 17.1
2003 1,743,686[63] 16.7 18.4
2004 1,889,175[64] 16.6 18.5
2005 1,587,790[64] 17.0 18.6
2006 1,569,429[65] 16.9 18.5
2007 1,213,647[65] 18.4 19.6
2008 1,239,445 [66] 14.2 15.4
2009 1,181,089[66] 10.0 11.2
2010[62] 1,128,079[59] 14.2 15.3
Eurotunnel's freight subsidiary is Europorte 2.[67] In September 2006 EWS, the UK's largest rail freight operator, announced that owing to cessation of UK-French government subsidies of £52 million per annum to cover the Channel Tunnel "Minimum User Charge" (a subsidy of around £13,000 per train, at a traffic level of 4,000 trains per annum), freight trains would stop running after 30 November.[68]

Economic performance

Shares in Eurotunnel were issued at £3.50 per share on 9 December 1987. By mid-1989 the price had risen to £11.00. Delays and cost overruns led to the share price dropping; during demonstration runs in October 1994 the share price reached an all-time low value. Eurotunnel suspended payment on its debt in September 1995 to avoid bankruptcy.[69] In December 1997 the British and French governments extended Eurotunnel's operating concession by 34 years to 2086. Financial restructuring of Eurotunnel occurred in mid-1998, reducing debt and financial charges. Despite the restructuring The Economist reported in 1998 that to break even Eurotunnel would have to increase fares, traffic and market share for sustainability.[70] A cost benefit analysis of the Channel Tunnel indicated that there were few impacts on the wider economy and few developments associated with the project, and that the British economy would have been better off if the tunnel had not been constructed.[57][71]
Under the terms of the Concession, Eurotunnel was obliged to investigate a cross-Channel road tunnel. In December 1999 road and rail tunnel proposals were presented to the British and French governments, but it was stressed that there was not enough demand for a second tunnel.[72] A three-way treaty between the United Kingdom, France and Belgium governs border controls, with the establishment of control zones wherein the officers of the other nation may exercise limited customs and law enforcement powers. For most purposes these are at either end of the tunnel, with the French border controls on the UK side of the tunnel and vice versa. For certain city-to-city trains, the train itself represents a control zone.[73] A binational emergency plan coordinates UK and French emergency activities.[74]
In 1999 Eurostar posted its first ever net profits, having previously made a loss of £925m in 1995.[23]

Terminals

A Peugeot 807 entering a shuttle wagon at the French terminal at Coquelles near Calais in northern France
The terminals sites are at Cheriton (Folkestone in the United Kingdom) and Coquelles (Calais in France). The terminals are unique facilities designed to transfer vehicles from the motorway onto trains at a rate of 700 cars and 113 heavy vehicles per hour. The UK site uses the M20 motorway. The terminals are organised with the frontier controls juxtaposed with the entry to the system to allow travellers to go onto the motorway at the destination country immediately after leaving the shuttle. The area of the UK site was severely constrained and the design was challenging. The French layout was achieved more easily. To achieve design output, the shuttles accept cars on double-decks; for flexibility, ramps were placed inside the shuttles to provide access to the top decks.[75] At Folkestone there are 20 kilometres (12 mi) of mainline track and 45 turnouts with eight platforms. At Calais there are 30 kilometres (19 mi) of track with 44 turnouts. At the terminals the shuttle trains traverse a figure eight to reduce uneven wear on the wheels.[51] There is a freight marshalling yard west of Cheriton at Dollands Moor Freight Yard.

Regional impact

A 1996 report from the European Commission predicted that Kent and Nord-Pas de Calais had to face increased traffic volumes due to general growth of cross-Channel traffic and traffic attracted by the tunnel. In Kent, a high-speed rail line to London would transfer traffic from road to rail.[76] Kent's regional development would benefit from the tunnel, but being so close to London restricts the benefits. Gains are in the traditional industries and are largely dependent on the development of Ashford International passenger station, without which Kent would be totally dependent on London's expansion. Nord-Pas-de-Calais enjoys a strong internal symbolic effect of the Tunnel which results in significant gains in manufacturing.[77]
The removal of a bottleneck by means like the Channel Tunnel does not necessarily induce economic gains in all adjacent regions, the image of a region being connected to the European high-speed transport and active political response are more important for regional economic development. However, some small-medium enterprises located in the immediate vicinity of the terminal have used the opportunity to re-brand the profile of their business with positive effect, such as The New Inn at Etchinghill which was able to commercially exploit its unique selling point as being 'the closest pub to the Channel Tunnel'. Tunnel-induced regional development is small compared to general economic growth.[78] The South East of England is likely to benefit developmentally and socially from faster and cheaper transport to continental Europe, but the benefits are unlikely to be equally distributed throughout the region. The overall environmental impact is almost certainly negative.[79]
Five years after the opening of the tunnel, there were few and small impacts on the wider economy, and it was difficult to identify major developments associated with the tunnel.[80] It has been postulated that the British economy would have actually been better off without the costs from the construction project,[81] both Eurotunnel and Eurostar, companies heavily involved in the Channel Tunnel's construction and operation, have had to resort to large amounts of government aid to deal with debts amounted.[82][83][84] Eurotunnel has been described as being in a serious situation.[85]

Incidents

Fires

There have been three fires in the Channel Tunnel that were significant enough to close the tunnel—all on the heavy goods vehicle (HGV) shuttles—and other more minor incidents.
During an "invitation only" testing phase on 9 December 1994, a fire broke out in a Ford Escort car whilst its owner had been loading it on to the upper deck of a tourist shuttle. The fire started at approximately 10:00 with the shuttle train stationary in the Folkestone terminal and was extinguished around 40 minutes later with no passenger injuries.[86]
On 18 November 1996, a fire broke out on a heavy goods vehicle shuttle wagon in the tunnel but nobody was seriously hurt. The exact cause is unknown,[87] although it was not a Eurotunnel equipment or rolling stock problem; it may have been due to arson of a heavy goods vehicle. It is estimated that the heart of the fire reached 1,000 °C (1,800 °F), with the tunnel severely damaged over 46 metres (151 ft), with some 500 metres (1,640 ft) affected to some extent. Full operation recommenced six months after the fire.[88]
The tunnel was closed for several hours on 21 August 2006, when a truck on an HGV shuttle train caught fire.[89][90] On 11 September 2008, a fire occurred in the Channel Tunnel at 13:57 GMT. The incident started on a freight-carrying vehicle train travelling towards France.[91] The event occurred 11 kilometres (6.8 mi) from the French entrance to the tunnel. No one was killed but several people were taken to hospitals suffering from smoke inhalation, and minor cuts and bruises. The tunnel was closed to all traffic, with the undamaged South Tunnel reopening for limited services two days later.[92] Full service resumed on 9 February 2009[93] after repairs costing €60 million.

Train failures

On the night of 19/20 February 1996, approximately 1,000 passengers became trapped in the Channel Tunnel when two British Rail Class 373 trains on continent-bound Eurostar service broke down owing to failures of electronic circuits caused by snow and ice being deposited and then melting on the circuit boards.[94]
On 3 August 2007, an electrical failure lasting six hours caused passengers to be trapped in the tunnel on a Eurotunnel shuttle crossing.[95]
On the evening of 18 December 2009, during the December 2009 European snowfall, five London-bound trains operating Eurostar services failed inside the tunnel, trapping 2,000 passengers in the tunnel overnight. Five Class 373 trains had departed from Brussels and Paris and encountered cold temperatures in Northern France, the coldest for eight years.[96] A Eurotunnel spokesperson explained that the problem had arisen because of 'fluffy snow' in France,[97] which had evaded the 'winterisation' shields designed to stop snow getting into the electrics.[98] Electrical failure was then caused by the transition from the cold air in France to the warm atmosphere inside the tunnel.[99] One train from Brussels had been turned back before reaching the tunnel; two trains were hauled out of the tunnel using diesel-powered Eurotunnel Class 0001. The blocking of the Channel Tunnel led to the implementation of Operation Stack, the transformation of the M20 motorway into a linear car park.[100]
Snow that had built up on the trains then melted in the heat of the tunnel, the water causing electrical faults.[101][102][103][104] The occasion was the first time during the fifteen years that a Eurostar train had to be evacuated inside the tunnel itself; the failing of four at once being described as "unprecedented".[105] The Channel Tunnel reopened the following morning.[106] Nirj Deva, Member of the European Parliament for South East England, had called for Eurostar chief executive Richard Brown to resign over the incidents.[107] An independent report by Christopher Garnett (former CEO of Great North Eastern Railway) and Claude Gressier (a French transport expert) on the 18/19 December 2009 incidents was issued in February 2010, making 21 recommendations.[108][109]
A further Class 373 unit on Brussels–London service broke down in the tunnel on 7 January 2010. The train had 236 passengers on board and was towed to Ashford; other trains that had not yet reached the tunnel were turned back.[110][111]

Asylum and immigration

Immigrants and would-be asylum seekers have been known to use the tunnel to attempt to enter Britain. By 1997, the problem had already attracted international press attention, and the French Red Cross opened a refugee centre at Sangatte in 1999, using a warehouse once used for tunnel construction; by 2002 it housed up to 1500 persons at a time, most of them trying to get to the UK.[112] In 2001, most came from Afghanistan, Iraq and Iran, but African and Eastern European countries are also represented.[113]
Most migrants who got into Britain found some way to ride a freight train, but others used Eurostar. Though the facilities were fenced, airtight security was deemed impossible; refugees would even jump from bridges onto moving trains. In several incidents people were injured during the crossing; others tampered with railway equipment, causing delays and requiring repairs.[114] Eurotunnel said it was losing £5m per month because of the problem.[115] A dozen refugees have died in crossing attempts.[112]
In 2001 and 2002, several riots broke out at Sangatte and groups of refugees (up to 550 in a December 2001 incident) stormed the fences and attempted to enter en masse.[116] Immigrants have also arrived as legitimate Eurostar passengers without proper entry papers.[117]
Local authorities in both France and the UK called for the closure of Sangatte, and Eurotunnel twice sought an injunction against the centre.[112] The United Kingdom blamed France for allowing Sangatte to open, and France blamed the UK for its lax asylum rules and the EU for not having a uniform immigration policy.[115] The cause célèbre nature of the problem even included journalists detained as they followed refugees onto railway property.[118]
In 2002, after the European Commission told France that it was in breach of European Union rules on the free transfer of goods, because of the delays and closures as a result of its poor security, a double fence was built at a cost of £5 million, reducing the numbers of refugees detected each week reaching Britain on goods trains from 250 to almost none.[119] Other measures included CCTV cameras and increased police patrols.[120] At the end of 2002, the Sangatte centre was closed after the UK agreed to take some of its refugees.[121]

Safety

The Channel Tunnel Safety Authority is responsible for some aspects of safety regulation in the tunnel; it reports to the IGC.[122]
The service tunnel is used for access to technical equipment in cross-passages and equipment rooms, to provide fresh-air ventilation, and for emergency evacuation. The Service Tunnel Transport System (STTS) allows fast access to all areas of the tunnel. The service vehicles are rubber-tyred with a buried guidance wire system. Twenty-four STTS vehicles were made, and are used mainly for maintenance but also for firefighting and in emergencies. "Pods" with different purposes, up to a payload of 2.5–5 t (2.8–5.5 tons), are inserted into the side of the vehicles. The STTS vehicles cannot turn around within the tunnel, and are driven from either end. The maximum speed is 80 km/h (50 mph) when the steering is locked. A smaller fleet of fifteen Light Service Tunnel Vehicles (LADOGS) were introduced to supplement the STTSs. The LADOGS have a short wheelbase with a 3.4 m (11 ft) turning circle allowing two-point turns within the service tunnel. Steering cannot be locked like the STTS vehicles, and maximum speed is 50 km/h (31 mph). Pods up to 1 tonne can be loaded onto the rear of the vehicles. Drivers in the tunnel sit on the right, and the vehicles drive on the left. Owing to the risk of French personnel driving on their native right side of the road, sensors in the road vehicles alert the driver if the vehicle strays to the right side of the tunnel.[123]
The three tunnels contain 6,000 tonnes (6,600 tons) of air that needs to be conditioned for comfort and safety. Air is supplied from ventilation buildings at Shakespeare Cliff and Sangatte, with each building capable of full duty providing 100% standby capacity. Supplementary ventilation also exists on either side of the tunnel. In the event of a fire, ventilation is used to keep smoke out of the service tunnel and move smoke in one direction in the main tunnel to give passengers clean air. The Channel Tunnel was the first mainline railway tunnel to have special cooling equipment. Heat is generated from traction equipment and drag. The design limit was set at 30 °C (86 °F), using a mechanical cooling system with refrigeration plants on both the English and French sides that run chilled water circulating in pipes within the tunnel.[124]
Trains travelling at high speed create piston-effect pressure changes that can affect passenger comfort, ventilation systems, tunnel doors, fans and the structure of the trains, and drag on the trains.[124] Piston relief ducts of 2-metre (7 ft) diameter were chosen to solve the problem, with 4 ducts per kilometre to give close to optimum results. Unfortunately this design led to unacceptable lateral forces on the trains so a reduction in train speed was required and restrictors were installed in the ducts.[125]
The safety issue of a fire on a passenger-vehicle shuttle garnered much attention, with Eurotunnel itself noting that fire was the risk gathering the most attention in a 1994 Safety Case for three reasons: ferry companies opposed to passengers being allowed to remain with their cars; Home Office statistics indicating that car fires had doubled in ten years; and the long length of the tunnel. Eurotunnel commissioned the UK Fire Research Station to give reports of vehicle fires, as well as liaising with Kent Fire Brigade to gather vehicle fire statistics over one year. Fire tests took place at the French Mines Research Establishment with a mock wagon used to investigate how cars burned.[126] The wagon door systems are designed to withstand fire inside the wagon for 30 minutes, longer than the transit time of 27 minutes. Wagon air conditioning units help to purge dangerous fumes from inside the wagon before travel. Each wagon has a fire detection and extinguishing system, with sensing of ions or ultraviolet radiation, smoke and gases that can trigger halon gas to quench a fire. Since the Heavy Goods Vehicle (HGV) wagons are not covered, fire sensors are located on the loading wagon and in the tunnel itself. A 10-inch (250 mm) water main in the service tunnel provides water to the main tunnels at 125-metre (410 ft) intervals.[127] The ventilation system can control smoke movement. Special arrival sidings exist to accept a train that is on fire, as the train is not allowed to stop whilst on fire in the tunnel. Eurotunnel has banned a wide range of hazardous goods from travelling in the tunnel. Two STTS vehicles with firefighting pods are on duty at all times, with a maximum delay of 10 minutes before they reach a burning train.[88]

USS Ronald Reagan (CVN-76)

The USS Ronald Reagan
USS Ronald Reagan in the Straits of Magellan in 2004.
Career
Name: USS Ronald Reagan (CVN-76)
Namesake: President Ronald Reagan
Ordered: 8 December 1994
Builder: Northrop Grumman Newport News
Laid down: 12 February 1998
Launched: 4 March 2001
Sponsored by: Nancy Reagan
Commissioned: 12 July 2003
Homeport: NS North Island San Diego, California
Status: in active service, as of 2011
General characteristics
Class and type: Nimitz-class aircraft carrier, Ronald Reagan subclass
Displacement: 101,400 long tons (113,600 short tons)[1]
Length: Overall: 1,092 feet (332.8 m)
Waterline: 1,040 feet (317.0 m)
Beam: Overall: 252 ft (76.8 m)
Waterline: 134 ft (40.8 m)
Draft: Maximum navigational: 37 ft (11.3 m)
Limit: 41 ft (12.5 m)
Propulsion: 2 × Westinghouse A4W nuclear reactors
4 × steam turbines
4 × shafts
260,000 shp (194 MW)
Speed: 30+ knots (56+ km/h; 35+ mph)
Range: Essentially unlimited distance; 20 years
Complement: Ship's company: 3,200
Air wing: 2,480
Sensors and
processing systems:
SPS-48E 3-D air search radar
SPS-49A(V)1 2-D air search radar
SPQ-9B fire control radar
2 × SPN-46 air traffic control radars
SPN-43C air traffic control radar
SPN-41 instrument landing system radar
3 × Mk 91 NSSM guidance systems
3 × Mk 95 radars
Electronic warfare
and decoys:
SLQ-32A(V)4 Countermeasures suite
SLQ-25A Nixie torpedo countermeasures
Armament: 2 × Mk 29 Sea Sparrow
2 × RIM-116 Rolling Airframe Missile
Armor: Classified
Aircraft carried: 90 fixed wing and helicopters
Motto: Peace Through Strength
Nickname: Gipper
USS Ronald Reagan (CVN-76) is a Nimitz-class nuclear-powered supercarrier in the service of the United States Navy. The ninth ship of her class,[2] she is named in honor of former President Ronald Reagan, President of the United States from 1981 to 1989. Upon her christening in 2001, she was the first ship to be named for a former president still living at the time.

Contents

  • 1 Ship's seal
  • 2 Naming
  • 3 Design and construction
  • 4 Service history
    • 4.1 2006 maiden deployment
    • 4.2 2007 surge deployment
    • 4.3 2008 deployment
    • 4.4 2009 deployment
    • 4.5 2010
    • 4.6 2011
  • 5 Commanding officers

Ship's seal

CVN 76 Seal.
The design of Ronald Reagan’s seal was created entirely by her plankowner crew with historical assistance provided by staff members at the Ronald Reagan Presidential Library foundation. The red border that rings the ship’s seal is similar to the distinctive red rim that defines the White House china designed for the Reagans during their White House years. Four gold stars represent President Reagan’s 40th presidency and his four pillars of freedom: individual liberty; economic opportunity; global democracy; and national pride. “Peace through Strength” was a recurring theme of the President’s life in public service. The aircraft carrier is positioned by the West Coast, representing President Reagan’s two terms as Governor of California and the ship’s homeport in the Pacific Fleet. The three aircraft with their patriotic contrails symbolize the three major military operations the President directed during his tenure: Operation Urgent Fury (Grenada/1983); Operation El Dorado Canyon (Libya/1986); and Operation Praying Mantis (Iran/1988). The view of the globe signifies the President’s vision of global democracy, and the center is the United States representing the country's national pride. Colors of red, white and blue dominate the seal reflecting the American flag.[3]

Naming

Ronald Reagan was the first nuclear powered warship of any kind to be named in honor of a living former president.[4] Unlike most of the other men honored by inclusion in this group, Reagan was not associated with the United States Navy, apart from his term as Commander-in-Chief, though one of his key initiatives in office was the 600-ship Navy program.
Former First Lady Nancy Reagan christens USS Ronald Reagan with President George W. Bush and Newport News Shipbuilding CEO William Frick looking on, 4 March 2001

Design and construction

The contract to build Reagan was awarded to Northrop Grumman Newport News and Dry Dock Company in Newport News, Virginia on 8 December 1994, and her keel was laid down on 12 February 1998. The budget for the ship had to be increased several times and ultimately $4.5 billion was spent on her construction.[5] This included a redesigned ship island.[6] Reagan was christened by Reagan's wife Nancy on 4 March 2001 at Newport News Shipbuilding, the crew moved aboard on 30 October 2002,[7] and the ship was commissioned on 12 July 2003 at Naval Station Norfolk, with Captain J. W. Goodwin in command. Vice President Dick Cheney and Lynne Cheney were both present at the ceremony, as well as Nancy Reagan, who gave the ship's crew the traditional first order as an active unit of the Navy: "Man the ship and bring her to life." Ronald Reagan made her maiden voyage on 21 July 2003. President Reagan, who did not attend either the launch or the commissioning due to Alzheimer's disease, died eleven months later. At the end of the graveside services, the ship's commanding officer at that time, Captain James Symonds, presented the flag that draped the former president's casket to Mrs. Reagan at her request. This was also the flag that had flown over Capitol Hill on 20 January 1981, when the president was inaugurated. At a later date, Captain Symonds also presented Mrs. Reagan the flag that had been flying over Ronald Reagan when the former president died.
Commissioning ceremony of USS Ronald Reagan, 2003
Ronald Reagan conducted her maiden port visit in Fort Lauderdale, Florida, from 11–14 November 2003.

Service history

After a five-month post shakedown availability (PSA), Reagan received flight deck certification on 8 May 2004,[8] and then began her transit from Naval Station Norfolk, Va., around Cape Horn, South America, to her new homeport of Naval Air Station North Island, San Diego, California. Carrier Air Wing Eleven, which is normally assigned to USS Nimitz, embarked only 25 percent of its total strength for the transit. The squadrons making the transit were VFA-14 and VFA-41 flying the F/A-18E/F Super Hornet, VAW-117 flying the E-2C Hawkeye 2000, HS-6 flying the SH-60F Seahawk and VRC-30 flying the C-2A Greyhound. The ship transited the Strait of Magellan on 20–21 June and made port visits to Rio de Janeiro, Brazil, Valparaiso, Chile, and Callao, Peru before arriving in San Diego on 23 July 2004.
Gringo-Gaucho maneuvers with the Argentine Navy during 2004 transit around South America

2006 maiden deployment

USS Ronald Reagan departed San Diego on 4 January 2006, on her maiden deployment to conduct naval operations in support of Operation Iraqi Freedom and Operation Enduring Freedom, as well as to conduct maritime security operations (MSO) in the Persian Gulf. The ship entered the Gulf on 22 February 2006, and returned from deployment on 6 July 2006.[9][10]

2007 surge deployment

USS Ronald Reagan and the Reagan Carrier Strike Group (CSG) departed North Island, Coronado in San Diego on 27 January 2007 on an unscheduled surge deployment[11] to the Western Pacific, fulfilling the role of the forward deployed carrier Kitty Hawk while it underwent maintenance in Japan. On 20 April 2007, Ronald Reagan and her CSG returned to Coronado. The "surge deployment" was part of the Navy's Fleet Response Plan (FRP), which provides the U.S. with the ability to respond to any global commitment with flexible and sustainable forces and the ability to rapidly respond to a range of situations on short notice.
In January 2007, it was announced that Ronald Reagan had earned the 2006 Commander Naval Air Force, Pacific Carrier Battle Efficiency “E” award for the West Coast, the first Battle "E” ever for the carrier.[12] On 28 January 2006, an F/A-18 Hornet strike fighter attempting a night landing aboard Reagan crashed into the ship's flight deck about 200 km (120 miles) southeast of Brisbane, Australia. The aircraft struck the ramp at a low angle, caught fire and skidded overboard. The pilot ejected safely, but the aircraft was lost.[13][14][15]
Reagan returned to Naval Air Station North Island on 20 April 2007, following the three-month deployment in support of operations in the Western Pacific.
USS Ronald Reagan conducts rudder checks in October 2007, as part of the ship's periodic inspection
On 15 December 2007, the carrier answered a distress call from a cruise ship off the coast of Baja California. An Illinois teenager whose appendix had ruptured while on a Mexican cruise was airlifted by an SH-60 helicopter to Ronald Reagan, where an emergency appendectomy was performed by the ship's surgeon.[16]

2008 deployment

USS Ronald Reagan, with CVW-14 embarked, departed San Diego on 19 May 2008, for a scheduled 7th Fleet and 5th Fleet deployment.
The Reagan Carrier Strike Group performed humanitarian assistance and disaster relief operations in the Philippines on 24 June 2008 after that country was devastated by Typhoon Fengshen, killing hundreds from the central island regions and the main island of Luzon. The typhoon also capsized the passenger ferry MV Princess of the Stars.[17] Working in support of the Armed Forces of the Philippines, Reagan and her escorts of Carrier Strike Group 7 focused their efforts on the island of Panay in the Central Visayas. For eight days, SH-60 Seahawk helicopters and C-2A Greyhound aircraft of the Ronald Reagan Strike Group helped deliver more than 519,000 lbs. of rice, fresh water and other supplies to areas of Panay, which were not reachable via truck due to flooded roads. The mission in Panay would earn the entire strike group the Navy's Humanitarian Service Medal.
The Strike Group arrived in the U.S. Fifth Fleet area on 28 August 2008, where she launched more than 1,150 sorties into Afghanistan in support of Operation Enduring Freedom. Reagan returned to San Diego on 25 November 2008.
Sailors and their families await a small arms demo during Tiger Cruise 2008.
USS Ronald Reagan received word in February 2009 that the ship had won its second Battle Effectiveness Award.[18]

2009 deployment

On May 28, 2009, Reagan deployed with Carrier Air Wing 14 to the 7th and 5th Fleet Areas of Responsibility.[19] Reagan relieved the Eisenhower CSG and launched its first sorties in support of OEF on 6 July. Reagan returned to homeport on 21 October after a five-month deployment.[20]

2010

In early 2010, Reagan was awarded the 2009 Chief of Naval Operations Afloat Safety "S" Award.[21] and the 2009 Pacific Fleet Battle "E" for combat efficiency. The Battle "E" award was Reagan's second consecutive and third in four years.[22]
In November 2010, Reagan provided emergency supplies and assistance to passengers stranded aboard the Carnival Splendor, which was rendered inoperable in the Pacific Ocean by an engine fire.[23]

2011

On 11 March 2011, Reagan was in the Korean peninsula region for a long-planned exercise off Korea, but was redirected towards Japan to provide support after the massive 2011 Tōhoku earthquake and tsunami. The ship, stationed off Sendai, was used as a floating refueling station for Japanese military and coast guard helicopters flying relief missions in the area.[24] US Navy helicopters also flew relief missions from the carrier. On 14 March 2011, the ship was forced to relocate to avoid a radioactive plume from the Fukushima I nuclear accidents which had irradiated 17 crewmembers of three helicopter crews.[25][dead link] On March 23, the Reagan's crew conducted a radiation decontamination operation to remove any further radiation hazards from the ship, which included scrubbing down any surface that could have been contaminated, including the flight deck and aircraft.[26]
On 4 April 2011, Japan's minister of defense, Toshimi Kitazawa, accompanied by US ambassador to Japan John Roos, visited the ship to thank its crew for its assistance as part of Operation Tomodachi. Said Kitazawa, "I have never been more encouraged by and proud of the fact that the United States is our ally."[27]

Commanding officers

Captain James A. Symonds, right, turns over command to Captain Terry B. Kraft (November 2005)